The concept “Building Back Better” (BBB) was formally introduced following the 2004 Indian Ocean Tsunami, which implies using a collaborative approach to improve the physical, social and economic conditions of a community during post-disaster reconstruction and recovery. This paper introduces eight BBB Principles which contribute towards achieving BBB. The post-tsunami recovery effort in Sri Lanka was examined using the BBB Principles to determine the extent to which BBB has been incorporated in immediate and long-term disaster management practices. Reports, literature, and data collected from a site visit made to Sri Lanka in 2010/2011 were analysed to establish the findings. Although BBB concepts were recognized, failure in execution resulted in a non-BBB recovery. Lessons learnt from shortcomings have been understood and incorporated into current disaster management practices. Good BBB practices currently in effect include: hazard-based land-use planning and risk-based structural regulations; increased awareness; participatory approaches; and stakeholder training. The absence of legislative support to implement BBB initiatives is the only drawback preventing so far. Lessons from Sri Lanka can benefit disaster management practices worldwide.


Keywords

Post-disaster reconstruction; recovery; build back better; sri lanka; indian ocean tsunami

Full Text:

PDF

References

Victorian Bushfires Royal Commission 2010. Final Report - Summary. 2009 Victorian Bushfires Royal

Commission.

ADPC 2009. Detailed Scope of Work for Priority Implementation Partnership on Mainstreaming Disaster Risk

Reduction into Housing Sector in Sri Lanka (Phase II). Asian Disaster Preparedness Centre. Asian Development Bank, Japan Bank for International Cooporation & World Bank 2005. Preliminary Damage and

Needs Assessment. Sri Lanka 2005 Post-Tsunami Recovery Programme. Colombo: Asian Development Bank, Japan Bank for International Cooporation and World Bank.

Bakir, P. G. 2004. Proposal of a National Mitigation Strategy Against Earthquakes in Turkey. Natural Hazards, 33.

Baradan, B. 2006. Analysis of the Post-Disaster Reconstruction Process following the Turkish Earthquakes, 1999. In: Group, I. R. (ed.) International Conference on Post-Disaster Reconstruction Meeting Stakeholder Interests. Florence: University de Montreal.

Batteate, C. 2006. Urban Disaster Risk Reduction and Regeneration Planning: An Overview. Focus: Journal of the City and Regional Planning Department, 3, 11-17.

Boano, C. 2009. Housing anxiety and multiple geographies in post-tsunami Sri Lanka. Disasters, 33, 762-785.

Chang, Y., Wilkinson, S., Potangaroa, R. & Seville, E. 2010. Resourcing challenges for post-disaster housing reconstruction: A comparative analysis. Building Research and Information, 38, 247-264.

Christchurch City Council 2011. Central City Plan: Draft Central City Recovery Plan for Ministerial Approval. Christchurch: Christchurch City Council.

Christian Century Foundation 2010. Build back better. Christian Century, 127, 7-7.

Clinton, W. J. 2006. Lessons Learned from Tsunami Recovery: Key Propositions for Building Back Better. New York: Office of the UN Secretary-General's Special Envoy for Tsunami Recovery.

Cosgrave, J. 2007. Synthesis Report Expanded Summary: Joint evaluation of the international response to the Indian Ocean tsunami. In: Houghton, R. (ed.). London: Tsunami Evaluation Coalition.

Disaster Relief Monitoring Unit of the Human Rights Commission of Sri Lanka. Year. Building Back Better: Way Forward. In: National Workshop on Guiding Principles, 2006 Colombo, Sri Lanka. Practical Action - South Asia Programme.

DMC 2010. Disaster Management Centre Annual Report 2010. Disaster Management Centre.

DMC, ADPC & NHDA 2011a. Mainstreaming Disaster Risk Reduction in site planning of Aislaby and St. Clair's Estate Housing Projects managed by National Housing Development Authority. In: Centre, D. M., Centre, A. D. P. & Authority, N. H. D. (eds.). Colombo: DMC, ADPC and NHDA.

DMC, CCD & ADPC 2011b. Mainstreaming Disaster Risk Reduction into approval permits of development activities in the coastal areas of Sri Lanka. In: Disaster Management Centre, Coast Conservation Department & Asian Disaster Preparedness Centre (eds.). Colombo: DMC, CCD and ADPC.

DN & PA 2008. Disaster and Development in South Asia: Connects and Disconnects. South Asia Disaster Report Colombo: Duryog Nivaran & Practical Action.

DNS & PA 2005. Tackling the Tides and Tremors: South Asia Disaster Report 2005. Duryog Nivaran Secretariat & Practical Action - South Asia Programme.

Edwards, W. 2010. State Building Codes Remain Inadequate Five Years After Hurricane Katrina Hit. National Underwriter / P&C, 114, 28.

Egbelakin, T. K., Wilkinson, S., Potangaroa, R. & Ingham, J. 2011. Challenges to successful seismic retrofit implementation: a socio-behavioural perspective. Building Research & Information, 39, 286-300.

FEMA 2000. Rebuilding for a More Sustainable Future: An Operational Framework. FEMA Report. Washington, DC: Federal Emergency Management Agency. Florian, S. 2007. Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia—Rebuilding lives. Habitat

International, 31, 150-166.

Frerks, G. & Klem, B. 2005. Tsunami Response in Sri Lanka: Report on a Field Visit From 6-20 February 2005. Wageningen: Wageningden University & Clingdael University.

Frist, W. H. 2012. Helping Haiti build back better. The Washington Times.

GoSL 2005a. Post-Tsunami Recovery and Reconstruction Strategy. Colombo.

GoSL 2005b. Post Tsunami Recovery and Reconstruction: Joint report of the Government of Sri Lanka and Development Partners. Colombo.

Haigh, R., Amaratunga, D., Baldry, D., Pathirage, C. & Thurairajah, N. 2009. ISLAND - Inspiring Sri Lankan Renewal and Development. RICS RESEARCH. Salford: University of Salford, United Kingdom.

Halvorson, S. J. & Hamilton, J. P. 2010. In the aftermath of the Qa'yamat: the Kashmir earthquake disaster in northern Pakistan. Disasters, 34, 184-204.

James Lee Witt Associates 2005. Building Back Better and Safer: Private Sector Summit on Post-Tsunami Reconstruction, Washington DC, James Lee Witt Associates, LLC.

Johnson, C., Lizarralde, G. & Davidson, C. H. 2006. A systems view of temporary housing projects in post-disaster reconstruction. Construction Management & Economics, 24, 367-378.

Kennedy, J. 2009. Disaster mitigation lessons from "build back better" following the 26 December 2004 Tsunamis In: Ashmore, J., Babister, E., Kelman, I. & Zarins, J. (eds.) Water and Urban Development Paradigms. London: Taylor and Francis Group.

Kennedy, J., Ashmore, J., Babister, E. & Kelman, I. 2008. The Meaning of ‘Build Back Better’: Evidence From PostTsunami Aceh and Sri Lanka. Journal of Contingencies & Crisis Management, 16, 24-36.

Khasalamwa, S. 2009. Is ‘build back better’ a response to vulnerability? Analysis of the post-tsunami humanitarian interventions in Sri Lanka. Norwegian Journal of Geography, 63, 73 - 88.

Khazai, B., Franco, G., Ingram, J. C., Rio, C. R. d., Dias, P., Dissanayake, R., Chandratilake, R. & Kanna, S. J. 2006. Post-December 2004 Tsunami Reconstruction in Sri Lanka and Its Potential Impacts on Future Vulnerability. Earthquake Spectra, 22, S829–S844.

Lewis, J. 2003. Housing construction in earthquake-prone places: Perspectives, priorities and projections for development. The Australian Journal of Emergency Management, 18, 35-44.

Lloyd-Jones, T. 2006. Mind the Gap! Post-disaster reconstruction and the transition from humanitarian relief. London: Royal Institution of Chartered Surveyors (IRCS).

Lyons, M. 2009. Building Back Better: The Large-Scale Impact of Small-Scale Approaches to Reconstruction. World Development, 37, 385-398.

Meese III, E., Butler, S. M. & Holmes, K. R. 2005. From Tragedy to Triumph: Principled Solutions for Rebuilding Lives and Communities. Heritage Special Report. Washington DC: The Heritage Foundation.

Meigh, D. 2009. Aceh emergency support for irrigation - building back better. Proceedings of ICE Civil Engineering, 162, 171-179.

Mikko, K. 2009. Managing for innovation in large and complex recovery programmes: Tsunami lessons from Sri Lanka. International Journal of Project Management, 27, 123-130.

Monday, J. L. 2002. Building Back Better: Creating a Sustainable Community after Disaster. Natural Hazards Informer [Online], 3. Available: http://www.colorado.edu/hazards/publications/informer/infrmr3/informer3b.htm [Accessed

02.13].

Mora, S. & Keipi, K. 2006. Disaster risk management in development projects: models and checklists. Bulletin of Engineering Geology and the Environment, 65, 155-165.

Mulligan, M. & Shaw, J. 2007. What the world can learn from Sri Lanka's Post-Tsunami experiences. International Journal of Asia-Pacific Studies, 3, 65-91.

NZ Red Cross. 2009. Focus moves to long-term recovery and rebuilding in Samoa Available: http://reliefweb.int/report/samoa/focus-moves-long-term-recovery-and-rebuilding-samoa

http://www.redcross.org.nz/mediareleases [Accessed 27.07.12].

Omidvar, B., Zafari, H. & Derakhshan, S. 2010. Reconstruction management policies in residential and commercial sectors after the 2003 bam earthquake in Iran. Natural Hazards, 54, 289-306.

Pathiraja, M. & Tombesi, P. 2009. Towards a more "robust" technology? Capacity building in post-tsunami Sri Lanka. DISASTER PREVENTION AND MANAGEMENT, 18, 55-65.

Potangaroa, R. 2009. Native Engineering Technologies: The 2009 Samoan Tsunami and its Signficance for New Zealand.

RADA 2006a. Divisional Livelihood Development Plan, Habaraduwa Division, Galle District. Reconstruction and Development Agency.

RADA 2006b. Sri Lanka: Mid-year review - Post tsunami recovery and reconstruction - June 2006 The Reconstruction and Development Agency.

Reddy, S. D. 2000. Factors Influencing the Incorporation of Hazard Mitigation During Recovery from Disaster. Natural Hazards, 22, 185-201.

Roberts, P. 2000. The Evolution, Definition and Purpose of Urban Regeneration. In: Roberts, P. & Sykes, H. (eds.) Urban Regeneration: A Handbook. London: Sage Publications.

Ruwanpura, K. N. 2009. Putting houses in place: rebuilding communities in post-tsunami Sri Lanka. Disasters, 33, 436-456.

Silva, M. W. A. d. 2009. Ethnicity, politics and inequality: post-tsunami humanitarian aid delivery in Ampara District, Sri Lanka. Disasters, 33, 253-273.

Society of Structural Engineers, S. L. 2005. Guidelines for Buildings at Risk from Natural Disasters: A response to the Tsunami of 26/12/2004 and a contribution to the task of reconstruction. Colombo: Society of Structural Engineers, Sri Lanka.

UN 2011. Sri Lanka Flash Appeal. United Nations.

United Nations 2005. Hyogo Framework For Action 2005-2015: Building the Resilience of Nations and Communities to Disasters. Hyogo: United Nations.

US Aid Asia 2007. Coastal Community Resilience (CCR) National Training Workshop Sri Lanka. US Aid Asia.

VBRRA 2009. Nine Month Report. Victorian Bushfire Reconstruction and Recovery Authority. Victorian Bushfire Reconstruction and Recovery Authority

VBRRA 2010. 12 Month Report. Victorian Bushfire Reconstruction and Recovery Authority. Victorian Bushfire Reconstruction and Recovery Authority


Refbacks

  • There are currently no refbacks.




Copyright (c) 2015 International Journal of Architectural Research: ArchNet-IJAR



ABOUT US


- ISSN (Online) #1938 7806 - ArchNet-IJAR is covered by ArchNet@ MIT Libraries, Avery Index to Architectural Periodicals, EBSCO, CNKI, Pro-Quest, Scopus-Elsevier, Web of Science.

- Published work in ArchNet-IJAR is licensed under Creative Commons: CC-BY--NC-ND license, see http://creativecommons.org/licenses/by-nc-nd/3.0/

Copyrights © Archnet-IJAR 2007-2018

 
 

Hit Counter
Visitor Hits Since 15 Jan 2014